Key statistics
Satellite SOLRAD 1 (GREB) at a glance.
Uptime
23810
Days in orbit
Revolutions
≈ 14.5
Per day
Orbit
LEO
Low Earth Orbit
Inclination
66.7
Latest
Satellite identification and parameters
Extended collection of information and parameters for SOLRAD 1 (GREB).
Object identification
Identified? True
Debris? False
Object name: SOLRAD 1 (GREB)
International designator: 1960-007B
Object number (NORAD): 46
Object ID (CCSDS): 46
Country: UNITED STATES OF AMERICA (US)
Current information (Y/N): Y
RCS size: MEDIUM
Orbital parameters
Period: 99.026 minutes
Inclination: 66.689 deg
SMA: 7090.239 km
Apoapsis: 849.241 km
Periapsis: 574.967 km
RAAN: 302.8178 deg
Eccentricy: 0.01934161
Argument of periapsis: 154.5527 deg
Mean anomaly: 206.5265 deg
Mean motion: 14.54157517 rev/day
Mean motion (dot): 0.00001249 rev/day2
B* drag term: 0.0002512057 1/REarth
Two-line elements (TLE)
Creation date: Aug. 30, 2025, 3:38 a.m.
Reference frame: TEME
Reference center: EARTH
Epoch: Aug. 29, 2025, 1:55 p.m. UTC
TLE line 0: 0 SOLRAD 1 (GREB)
TLE line 1: 1 00046U 60007B 25241.57986525 .00001249 00000-0 25121-3 0 9994
TLE line 2: 2 00046 66.6890 302.8178 0193416 154.5527 206.5265 14.54157517414598
Live tracking on map
Real-time ground track for satellite SOLRAD 1 (GREB).
In-orbit conjunctions
A list of the most updated potential collisions computed for object SOLRAD 1 (GREB).
Associated space launch
The Transit system was the first satellite navigation system to be used operationally. The system was primarily used by the U.S. Navy to provide accurate location information to its Polaris ballistic missile submarines, and it was also used as a navigation system by the Navy's surface ships, as well as for hydrographic survey and geodetic surveying.
SOLRAD 1 (GREB) was lifted into orbit during the mission ‘Thor DM-21 Ablestar | Transit 2A’, on board a Thor DM-21 Ablestar space rocket.
The launch took place on June 22, 1960, 5:54 a.m. from Space Launch Complex 17B.
For more information about the launch, click the button.

Thor DM-21 Ablestar | Transit 2A
Agency: N/A
Status: Launch Successful
Launch date: June 22, 1960, 5:54 a.m. UTC
Rocket: Thor DM-21 Ablestar
Launch pad: Space Launch Complex 17B
Location: Cape Canaveral SFS, FL, USA
...
Latest news about this satellite
There are no fresh news available about this satellite. Check back as we update our databases every day.
Newsletter sign-up
Weekly statistics, charts and insights to help you stay on top of the space industry.